Villa units at Amber Skye up for sale from $7.5 mil

Three villa devices at property advancement Brownish-yellow Skye, situated at 8 Brownish-yellow Road off Tanjong Katong Roadway in Area 15, are up for sale.

Brownish-yellow Skye is an advancement by CS Land (previously called China Sonangol Land) and also OKP Land that was completed in 2017. There are an overall of 109 units, which include a mix of loft, one-, two-, 3- and four-bedroom units. Please see Copen Grand EC for more info on the development.

The devices up for sale are Amber Skye’s suites, which are the development’s largest houses. Found on the first stage, the three duplex systems comprise a four-bedroom Garden Villa covering 4,628 sq ft, as well as 2 six-bedroom Grand Villas, measuring around 5,059 sq ft and 5,177 sq ft respectively.

The flooring location is inclusive of private encased spaces (PES), which refers to semi-outdoor locations beside the devices that create part of their personal strata area. Omitting the PES, flooring areas for the villas start from 3,035 sq ft, claims Loyalle Chin, associate team department director at PropNex Realty. PropNex as well as Huttons Group are jointly marketing the villas, which are being sold by the programmer.

Rates for the suites start from $7.5 million for the Garden Villa, which works out to $1,615 psf on its total floor location, or $2,463 psf on its flooring area leaving out the PES.

The rental properties include accessibility to an exclusive car park and are likewise equipped with a private lift. Contrasting the systems to strata landed housing in regards to dimension, PropNex’s Chin claims they appropriate for multi-generational families.

“With property costs listed below $ 2,000 psf on overall floor location, Amber Skye’s suites present an attractive acquiring possibility for investors as well as property buyers in the preferred District 15 neighbourhood,” he adds.

Brownish-yellow Skye is a short leave the upcoming Tanjong Katong MRT Station on the Thomson-East Coast Line that is slated to open in 2024.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published.